Nildoh ct
+918983321072

Products

6814772a5d263414004dd4a4 Card 2

product image
HDPE PIPE For Water Supply Infrastructure

Our HDPE Pipes for Water Supply Infrastructure are designed to provide a dependable, durable, and efficient solution for the transportation and distribution of potable and non-potable water. Manufactured in PE63, PE80, and PE100 material grades, these pipes are available in a wide range of sizes and pressure ratings to meet the requirements of diverse water supply projects. With excellent flexibility, corrosion resistance, impact strength, and long service life, HDPE pipes are suitable for municipal water supply schemes, irrigation networks, industrial water distribution, rural water supply projects, and other infrastructure applications. Product Specifications Specification Details Pipe Size Range 32 mm to 315 mm Pressure Rating PN4 to PN16 Material Grades PE63 / PE80 / PE100 Coil Sizes 32 mm to 125 mm Straight Lengths 6 m / 9 m / 12 m Straight Pipe Size Range 50 mm to 315 mm Available in Coils & Straight Lengths HDPE pipes are supplied in coiled form from 32 mm to 125 mm, offering convenient handling and installation, particularly for projects requiring long continuous pipe runs with fewer joints. For larger diameters, pipes are available in 6-metre, 9-metre, and 12-metre straight lengths, covering sizes from 50 mm to 315 mm. Key Features & Benefits Wide size range from 32 mm to 315 mm Pressure ratings from PN4 to PN16 Available in PE63, PE80 and PE100 grades Flexible and lightweight compared with conventional piping systems Excellent resistance to corrosion and many chemicals High impact and abrasion resistance Suitable for underground and infrastructure applications Long service life with low maintenance requirements Available in both coils and straight lengths Suitable for a wide range of water supply applications Applications Our HDPE water supply pipes can be used for: Municipal Water Supply Projects Rural Water Supply Schemes Drinking Water Distribution Networks Irrigation & Agricultural Water Systems Industrial Water Supply Water Transmission Pipelines Underground Water Distribution Infrastructure & Development Projects Pumping and Distribution Systems Why Choose HDPE Pipes? HDPE piping offers a combination of strength, flexibility, durability, and corrosion resistance, making it a preferred solution for modern water supply infrastructure. The availability of different material grades, pressure ratings, diameters, coil configurations, and straight lengths allows the piping system to be selected according to project requirements. Your Partner for Water Supply Infrastructure With a comprehensive range of HDPE Pipes from 32 mm to 315 mm, available in PN4 to PN16 pressure ratings and PE63/PE80/PE100 grades, we provide practical piping solutions for water supply and infrastructure projects across various applications.

6814772a5d263414004dd4a4 Card 2

product image
HDPE DUCT Pipes for HDD Applications

Reliable HDPE Ducting for Modern Electrical Infrastructure TATFLOW HDPE Pipes for Electrical Ducting are designed to provide a reliable, durable and efficient solution for protecting and routing electrical cables in underground and infrastructure projects. Manufactured using high-quality HDPE material, these pipes offer excellent flexibility, impact resistance and long-term performance in demanding installation conditions. Available in coil as well as straight-length forms, TATFLOW HDPE Electrical Duct Pipes are suitable for a wide range of electrical cable ducting requirements, including underground power distribution, utility infrastructure and cable protection applications. Available Sizes & Configurations TATFLOW HDPE Pipes are available in the following sizes and configurations: Coil & Length Form 110 mm 125 mm 140 mm 160 mm These sizes are available with different pressure ratings: PN 6 PN 8 PN 10 The coil form provides greater flexibility during installation and can help reduce the number of joints, making it suitable for applications requiring longer continuous duct runs. Straight Length Pipes For larger electrical ducting requirements, TATFLOW HDPE Pipes are available in: 160 mm to 315 mm diameter Standard straight length: 6 metres Manufactured for robust and reliable underground ducting applications Suitable for large-scale electrical infrastructure projects Conforming to IS 4984:2016 TATFLOW HDPE Pipes in the specified straight-length range are manufactured to conform to the requirements of IS 4984:2016, supporting consistent product quality and performance for infrastructure applications. Key Features High-quality HDPE construction Available in 110 mm, 125 mm, 140 mm and 160 mm sizes in coil and length forms Pressure ratings available in PN 6, PN 8 and PN 10 160 mm to 315 mm available in straight 6-metre lengths Excellent impact and abrasion resistance Flexible and convenient for installation Suitable for underground electrical cable protection Designed for long-term infrastructure applications Reduced maintenance requirements Suitable for large-scale utility and electrical projects Straight-length pipes conforming to IS 4984:2016 Applications TATFLOW HDPE Electrical Duct Pipes can be used for: Underground electrical cable ducting Power distribution networks Electrical utility infrastructure Cable protection systems Underground power projects Industrial electrical installations Road and infrastructure projects Municipal utility projects HDD and trench-based ducting applications, subject to project requirements Why Choose TATFLOW HDPE Electrical Duct Pipes? TATFLOW HDPE Pipes combine strength, flexibility and durability to provide dependable cable protection in underground electrical infrastructure. The availability of both coil and straight-length options allows project designers and contractors to select the appropriate pipe configuration according to installation requirements. With multiple diameters and pressure ratings, TATFLOW HDPE Electrical Duct Pipes offer a versatile solution for electrical ducting projects ranging from utility networks to large-scale infrastructure developments. Product Specification at a Glance Specification Details Product TATFLOW HDPE Pipe for Electrical Ducting Material HDPE Coil/Length Sizes 110 mm, 125 mm, 140 mm, 160 mm Pressure Ratings PN 6 / PN 8 / PN 10 Straight Length Range 160 mm – 315 mm Straight Length 6 metres Standard IS 4984:2016 Application Electrical Cable Ducting & Infrastructure TATFLOW – Dependable Solutions for Electrical Ducting Choose TATFLOW HDPE Pipes for Electrical Ducting for dependable cable protection, installation flexibility and long-lasting performance across electrical and infrastructure projects.

6814772a5d263414004dd4a4 Card 2

product image
TATFLOW HDPE Pipe for Electrical Ducting Solutions (HDD Application)

TATFLOW HDPE Pipe for Electrical Ducting Solutions (HDD Application) Reliable HDPE Ducting for Modern Electrical Infrastructure TATFLOW HDPE Pipes for Electrical Ducting are designed to provide a reliable, durable and efficient solution for protecting and routing electrical cables in underground and infrastructure projects. Manufactured using high-quality HDPE material, these pipes offer excellent flexibility, impact resistance and long-term performance in demanding installation conditions. Available in coil as well as straight-length forms, TATFLOW HDPE Electrical Duct Pipes are suitable for a wide range of electrical cable ducting requirements, including underground power distribution, utility infrastructure and cable protection applications. Available Sizes & Configurations TATFLOW HDPE Pipes are available in the following sizes and configurations: Coil & Length Form 110 mm 125 mm 140 mm 160 mm These sizes are available with different pressure ratings: PN 6 PN 8 PN 10 The coil form provides greater flexibility during installation and can help reduce the number of joints, making it suitable for applications requiring longer continuous duct runs. Straight Length Pipes For larger electrical ducting requirements, TATFLOW HDPE Pipes are available in: 160 mm to 315 mm diameter Standard straight length: 6 metres Manufactured for robust and reliable underground ducting applications Suitable for large-scale electrical infrastructure projects Conforming to IS 4984:2016 TATFLOW HDPE Pipes in the specified straight-length range are manufactured to conform to the requirements of IS 4984:2016, supporting consistent product quality and performance for infrastructure applications. Key Features High-quality HDPE construction Available in 110 mm, 125 mm, 140 mm and 160 mm sizes in coil and length forms Pressure ratings available in PN 6, PN 8 and PN 10 160 mm to 315 mm available in straight 6-metre lengths Excellent impact and abrasion resistance Flexible and convenient for installation Suitable for underground electrical cable protection Designed for long-term infrastructure applications Reduced maintenance requirements Suitable for large-scale utility and electrical projects Straight-length pipes conforming to IS 4984:2016 Applications TATFLOW HDPE Electrical Duct Pipes can be used for: Underground electrical cable ducting Power distribution networks Electrical utility infrastructure Cable protection systems Underground power projects Industrial electrical installations Road and infrastructure projects Municipal utility projects HDD and trench-based ducting applications, subject to project requirements Why Choose TATFLOW HDPE Electrical Duct Pipes? TATFLOW HDPE Pipes combine strength, flexibility and durability to provide dependable cable protection in underground electrical infrastructure. The availability of both coil and straight-length options allows project designers and contractors to select the appropriate pipe configuration according to installation requirements. With multiple diameters and pressure ratings, TATFLOW HDPE Electrical Duct Pipes offer a versatile solution for electrical ducting projects ranging from utility networks to large-scale infrastructure developments. Product Specifications Specification Details Product TATFLOW HDPE Pipe for Electrical Ducting Material HDPE Coil/Length Sizes 110 mm, 125 mm, 140 mm, 160 mm Pressure Ratings PN 6 / PN 8 / PN 10 Straight Length Range 160 mm – 315 mm Straight Length 6 metres Standard IS 4984:2016 Application Electrical Cable Ducting & Infrastructure TATFLOW – Dependable Solutions for Electrical Ducting Choose TATFLOW HDPE Pipes for Electrical Ducting for dependable cable protection, installation flexibility and long-lasting performance across electrical and infrastructure projects.

6814772a5d263414004dd4a4 Card 2

product image
PLB DUCT pipe for Railway Signal & Telecom Ducting

TATFLOW PLB Duct Pipe for Railway Signal & Telecom Ducting TATFLOW PLB Duct Pipe is a high-quality ducting solution designed for the safe and efficient installation and protection of Railway Signal, Telecommunication and communication cables. Manufactured for demanding infrastructure applications, these ducts provide a reliable pathway for underground and specialized cable installations while helping protect cables from external mechanical and environmental conditions. Available in multiple sizes and 8 different colours, TATFLOW PLB Duct Pipes are suitable for railway infrastructure projects, telecom networks, cable routes and other utility ducting applications. Applications TATFLOW PLB Duct Pipes are suitable for: Railway Signal Cable Ducting Railway Telecommunication Cable Ducting Railway Signalling Infrastructure Telecom Cable Networks Underground Communication Cable Installation Optical Fibre & Communication Cable Ducting Infrastructure and Utility Projects Cable Protection and Routing Applications Available Sizes Nominal Size Approx. ID/OD 40/33 mm 40/33 mm 50/42 mm 50/42 mm 63/50 mm 63/50 mm 75/63 mm 75/63 mm 90/76 mm 90/76 mm Available in 8 Colours TATFLOW PLB Duct Pipes are available in 8 colour options, allowing easy identification, segregation and organized cable routing across railway and telecom infrastructure projects. Key Features Designed for Railway Signal & Telecom applications Available in multiple sizes for different cable requirements Available in 8 colours Provides organized cable routing and protection Suitable for underground ducting applications Lightweight and convenient to handle Designed for infrastructure and utility projects Helps simplify cable identification and segregation Suitable for large-scale railway and telecommunication projects Railway Signal & Telecom Ducting Solution Railway signalling and telecommunication systems require properly planned cable infrastructure to maintain reliable communication and signalling networks. TATFLOW PLB Duct Pipes provide a dedicated ducting pathway for cables, helping maintain systematic cable routing and providing protection throughout the installation. Their availability in different dimensions and colours makes them suitable for projects where cable capacity, identification and route segregation are important considerations. Specification / Compliance Product: TATFLOW PLB Duct Pipe Application: Railway Signal & Telecom Ducting Available Sizes: 40/33, 50/42, 63/50, 75/63, 90/76 mm Colour Options: 8 Colours Reference: G.R. No. TEC/GR/FA/CDS/008/04/AUG-19 For project-specific technical requirements, installation conditions and applicable specifications, please refer to the relevant railway/telecommunication project documentation and approved technical requirements. Why Choose TATFLOW PLB Duct Pipe? TATFLOW PLB Duct Pipe is an effective choice for railway and telecom infrastructure where dependable cable routing, identification and protection are required. With multiple sizes and colour options, it offers flexibility for different signalling and communication ducting requirements. TATFLOW PLB Duct Pipe – Reliable Ducting for Railway Signal & Telecom Infrastructure

Phone Number

+918983321072

Mon-Thu: 10 AM - 2 PM • Fri: 3 PM - 7AM

Address W108/109, AMAR NAGAR T POINT 2ND LEFT NILDOH, GATE, Midc,, Hingna,Nagpur

Nildoh ct, Maharashtra, India, 441110