TATFLOW HDPE Pipe for Electrical Ducting Solutions (HDD Application)

TATFLOW HDPE Pipe for Electrical Ducting Solutions (HDD Application)

In stock

Description

TATFLOW HDPE Pipe for Electrical Ducting Solutions (HDD Application)

Reliable HDPE Ducting for Modern Electrical Infrastructure

TATFLOW HDPE Pipes for Electrical Ducting are designed to provide a reliable, durable and efficient solution for protecting and routing electrical cables in underground and infrastructure projects. Manufactured using high-quality HDPE material, these pipes offer excellent flexibility, impact resistance and long-term performance in demanding installation conditions.

Available in coil as well as straight-length forms, TATFLOW HDPE Electrical Duct Pipes are suitable for a wide range of electrical cable ducting requirements, including underground power distribution, utility infrastructure and cable protection applications.

Available Sizes & Configurations

TATFLOW HDPE Pipes are available in the following sizes and configurations:

Coil & Length Form

110 mm

125 mm

140 mm

160 mm

These sizes are available with different pressure ratings:

PN 6

PN 8

PN 10

The coil form provides greater flexibility during installation and can help reduce the number of joints, making it suitable for applications requiring longer continuous duct runs.

Straight Length Pipes

For larger electrical ducting requirements, TATFLOW HDPE Pipes are available in:

160 mm to 315 mm diameter

Standard straight length: 6 metres

Manufactured for robust and reliable underground ducting applications

Suitable for large-scale electrical infrastructure projects

Conforming to IS 4984:2016

TATFLOW HDPE Pipes in the specified straight-length range are manufactured to conform to the requirements of IS 4984:2016, supporting consistent product quality and performance for infrastructure applications.

Key Features

High-quality HDPE construction

Available in 110 mm, 125 mm, 140 mm and 160 mm sizes in coil and length forms

Pressure ratings available in PN 6, PN 8 and PN 10

160 mm to 315 mm available in straight 6-metre lengths

Excellent impact and abrasion resistance

Flexible and convenient for installation

Suitable for underground electrical cable protection

Designed for long-term infrastructure applications

Reduced maintenance requirements

Suitable for large-scale utility and electrical projects

Straight-length pipes conforming to IS 4984:2016

Applications

TATFLOW HDPE Electrical Duct Pipes can be used for:

Underground electrical cable ducting

Power distribution networks

Electrical utility infrastructure

Cable protection systems

Underground power projects

Industrial electrical installations

Road and infrastructure projects

Municipal utility projects

HDD and trench-based ducting applications, subject to project requirements

Why Choose TATFLOW HDPE Electrical Duct Pipes?

TATFLOW HDPE Pipes combine strength, flexibility and durability to provide dependable cable protection in underground electrical infrastructure. The availability of both coil and straight-length options allows project designers and contractors to select the appropriate pipe configuration according to installation requirements.

With multiple diameters and pressure ratings, TATFLOW HDPE Electrical Duct Pipes offer a versatile solution for electrical ducting projects ranging from utility networks to large-scale infrastructure developments.

Product Specifications

Specification Details

Product TATFLOW HDPE Pipe for Electrical Ducting

Material HDPE

Coil/Length Sizes 110 mm, 125 mm, 140 mm, 160 mm

Pressure Ratings PN 6 / PN 8 / PN 10

Straight Length Range 160 mm – 315 mm

Straight Length 6 metres

Standard IS 4984:2016

Application Electrical Cable Ducting & Infrastructure

TATFLOW – Dependable Solutions for Electrical Ducting

Choose TATFLOW HDPE Pipes for Electrical Ducting for dependable cable protection, installation flexibility and long-lasting performance across electrical and infrastructure projects.