HDPE DUCT Pipes for HDD Applications
Description
Reliable HDPE Ducting for Modern Electrical Infrastructure
TATFLOW HDPE Pipes for Electrical Ducting are designed to provide a reliable, durable and efficient solution for protecting and routing electrical cables in underground and infrastructure projects. Manufactured using high-quality HDPE material, these pipes offer excellent flexibility, impact resistance and long-term performance in demanding installation conditions.
Available in coil as well as straight-length forms, TATFLOW HDPE Electrical Duct Pipes are suitable for a wide range of electrical cable ducting requirements, including underground power distribution, utility infrastructure and cable protection applications.
Available Sizes & Configurations
TATFLOW HDPE Pipes are available in the following sizes and configurations:
Coil & Length Form
110 mm
125 mm
140 mm
160 mm
These sizes are available with different pressure ratings:
PN 6
PN 8
PN 10
The coil form provides greater flexibility during installation and can help reduce the number of joints, making it suitable for applications requiring longer continuous duct runs.
Straight Length Pipes
For larger electrical ducting requirements, TATFLOW HDPE Pipes are available in:
160 mm to 315 mm diameter
Standard straight length: 6 metres
Manufactured for robust and reliable underground ducting applications
Suitable for large-scale electrical infrastructure projects
Conforming to IS 4984:2016
TATFLOW HDPE Pipes in the specified straight-length range are manufactured to conform to the requirements of IS 4984:2016, supporting consistent product quality and performance for infrastructure applications.
Key Features
High-quality HDPE construction
Available in 110 mm, 125 mm, 140 mm and 160 mm sizes in coil and length forms
Pressure ratings available in PN 6, PN 8 and PN 10
160 mm to 315 mm available in straight 6-metre lengths
Excellent impact and abrasion resistance
Flexible and convenient for installation
Suitable for underground electrical cable protection
Designed for long-term infrastructure applications
Reduced maintenance requirements
Suitable for large-scale utility and electrical projects
Straight-length pipes conforming to IS 4984:2016
Applications
TATFLOW HDPE Electrical Duct Pipes can be used for:
Underground electrical cable ducting
Power distribution networks
Electrical utility infrastructure
Cable protection systems
Underground power projects
Industrial electrical installations
Road and infrastructure projects
Municipal utility projects
HDD and trench-based ducting applications, subject to project requirements
Why Choose TATFLOW HDPE Electrical Duct Pipes?
TATFLOW HDPE Pipes combine strength, flexibility and durability to provide dependable cable protection in underground electrical infrastructure. The availability of both coil and straight-length options allows project designers and contractors to select the appropriate pipe configuration according to installation requirements.
With multiple diameters and pressure ratings, TATFLOW HDPE Electrical Duct Pipes offer a versatile solution for electrical ducting projects ranging from utility networks to large-scale infrastructure developments.
Product Specification at a Glance
Specification Details
Product TATFLOW HDPE Pipe for Electrical Ducting
Material HDPE
Coil/Length Sizes 110 mm, 125 mm, 140 mm, 160 mm
Pressure Ratings PN 6 / PN 8 / PN 10
Straight Length Range 160 mm – 315 mm
Straight Length 6 metres
Standard IS 4984:2016
Application Electrical Cable Ducting & Infrastructure
TATFLOW – Dependable Solutions for Electrical Ducting
Choose TATFLOW HDPE Pipes for Electrical Ducting for dependable cable protection, installation flexibility and long-lasting performance across electrical and infrastructure projects.

